SHARP Engineering & Construction 1130 Fremont Ave, Suite 105-313, Seaside, CA 93955 • 831.915-9124

Commercial, concrete, 50,000 square foot parking lot construction

Pape Hyster-Bobcat – Salinas, CA

Excavated, graded and compacted approximately 50,000 square feet for parking lot expansion. Designed and installed drainage system. Supply, install and finish 150 cubic yards of concrete for parking area.

Key Clients